Zeus Network: Plans to Introduce 1%BTC Liquidity to Solana Ecosystem in Three Phases
Zeus Network, the cross-chain communication protocol for the Solana ecosystem, announced that it will achieve its goal of introducing 1% BTC liquidity into the Solana ecosystem in three phases. The first phase will introduce bitcoin into the Solana ecosystem by maintaining the BTC to ZEUS token exchange rate at 1:20,000 in the early stages, which will be dynamically adjusted based on the bitcoin market and Solana's liquidity needs as bitcoin liquidity enters the market. As bitcoin liquidity enters the market, the ratio will be dynamically adjusted based on the bitcoin market and Solana's liquidity needs; the second phase will be dedicated to building the ZPL-Asset ecosystem, open-sourcing the Zeus Programming Library (ZPL), and enabling xyzBTC; and the third phase will be dedicated to realising multi-chain asset interactions, and tapping into the liquidity of ZEUS and tokens such as BTC, LTC, DOGE, and KAS.
Disclaimer: The content of this article solely reflects the author's opinion and does not represent the platform in any capacity. This article is not intended to serve as a reference for making investment decisions.
You may also like
El Niño disrupts palm oil: Indonesia and Malaysia's production expected to drop by 3% in 2027, price may rise towards $1226
Continuous drought caused by a strong El Niño is expected to reduce yields next year, and palm oil production in Indonesia and Malaysia is projected to decline by 2027, tightening global supply and pushing prices higher.
Lighter falls 11% after Bitwise’s LIT ETP launch – But there’s a catch!
To fit more HBM into chips, Nvidia accelerates advancement of glass substrate technology
German equipment manufacturer SCHMID has disclosed that it is collaborating with core firms in the supply chains of Intel, Nvidia, and AMD to develop glass substrate production equipment. Glass substrates are expected to replace silicon interposers, enhancing packaging density and data transmission capacity, and allowing for the integration of more HBMs. However, obstacles remain in the TGV metallization process, end-customer certification has not yet been completed, and large-scale commercialization will still take time.